Job Description
1) Unpack and inspect hardware
2) Rack, mount, and/or position the product & components
3) Install and route power cables
4) Install and route data cables
5) Print and apply labels to newly installed cables
6) Power on equipment
7) Confirm server boots, check for error lights and obvious issues
8) Configure appliance for network connectivity / Configure an IP address
9) Unpack the Appliance
10) Install Optional Interface Cards or Memory into the Server
11) Validate Secure Remote Services Functionality
12) Upon completion of the installation, document any deviations made from the original Design Documentation. |
|